Captive Power Plant

PT Indorama Synthetics Tbk has a leadership position in polyester and spun yarns production and as manufacturer and exporter of quality polyester fibre and filament yarns, PET resins, spun yarns and finished fabrics.

The various process plants located at Purwakarta require vast amounts of steam and power. Steam is generated using oil fired low-pressure boilers in the plant. Power supply is generated using in-plant D.G. sets and the local PLN state supply grid.

As the cost of fuel and electricity tariff has escalated tremendously over the last few years, Indorama has decided to install a captive cogeneration power plant (CPP) to meet the requirements of steam and power for the process plant, economically.

The installed capacity of the coal fired cogeneration power plant is 2x30 mw. Total area of the CPP including green belt is about 16 hectares. The first unit was commissioned within 24 months from the date of agreement and the second unit within 27 months. The entire CPP is controlled from the central control room by DCS.

The power plant is equipped with a closed coal shed, pre-ESP, flue gas desulphurisation unit, bag filter, re-use water system and an ash dyke to fulfill environmental requirements of the IFC and Indonesian regulations.